Two Point Suspended Scaffold

Our Two Point Suspended Scaffold is the perfect solution for high-rise projects that require two workers to be suspended at once. This scaffold system features a sturdy design with durable materials and two suspension points for added stability. With a max weight capacity of 1000kg, it can handle tough jobs with ease. The scaffold system is easy to set up and can be adjusted to suit your specific needs. Our scaffold is perfect for painting, construction, and maintenance projects on high-rise buildings. Trust in our Two Point Suspended Scaffold for all your high-rise needs.

  Contact Now E-Mail Telephone WhatsApp
Product Details

Product description

Two Point Suspended Scaffold of suspension mechanism, suspension platform, hoist, safety lock, working wire rope, safety wire rope and electrical box and electrical control system and other main parts. In order to facilitate the transportation and handling, manufacturers in the product factory transportation according to components or groups, parts for decomposition, to the construction site after assembling into a whole machine.

The lifting movement of the electric cradle self-lifting scaffold is realized by manually or electrically inverted chain alternately lifting and lowering the movable frame and fixed frame. From the point of view of the structure of the lifting frame, the movable frame and the fixed frame are able to carry out the up and down relative movement between them. When the scaffolding is working, the movable frame and fixed frame are anchored to the wall with attached wall bolts, and there is no relative movement between the two frames. When the scaffolding needs to lift, Hebei galvanized basket activity frame and fixed frame in a frame is still anchored to the wall, the use of inverted chain to lift the other frame, between the two frames will produce relative movement. By alternately attaching the movable frame and fixed frame to the wall and lifting each other, the scaffolding can be lifted layer by layer along the pre-drilled holes on the wall.

Two Point Suspended Scaffold



Technical Parameters


appearance
painting/hot galvanized
fabrication materialsteel/aluminum alloy
rated load150kg500kg630kg800kg1000kg
lifting speed9-11m/min9-11m/min9-11m/min8-10m/min8-10m/min
motor power1.5kw2x1.5kw2x1.5kw2x1.8kw2x2.2kw
brake torque16kN2x16kN2x16kN2x16kN2x16kN
steel rope angle adjusting range3°-8°3°-8°3°-8°3°-8°3°-8°
distance between two steel rope≤100mm≤100mm≤100m≤100m≤100m
counter weight(optional)25kgx20pcs25kgx30pcs25kgx36pcs25kgx40pcs25kgx44pcs
diameter of steel rope8.3mm8.3mm8.3mm9.1mm10.2mm
max lifting height(m)300m300m300m300m300m
motor rotation speed1420r/min1420r/min1420r/min1420r/min1420r/min
voltage(3phases)(optional)220v/380v/415v/440v    50hz/60hz to be OEM

Two Point Suspended Scaffold

About Company


Based on the industry , create exclusive products

Shandong Ruierte Electromechanical Technology Co., Ltd. is a private sole proprietorship enterprise. It is located in Dezhou City, which is at the junction of Shandong Province and Hebei Province. It covers an area of 30 acres and has more than 50 employees. The annual sales volume exceeds 20,000 units. The company has first - class cranes. Basket experts and senior technicians. It has advanced design centers, manufacturing centers and testing centers. It has always been known for its "leading technology, superior performance, reliable quality and excellent service". 

Shandong Ruierte Electromechanical Technology Co., Ltd

Factory environment

Factory environmentFactory environment

Qualification Honors

Qualification Honors

Sales Countries

Sales Countries


FAQ


Q1. How much is this Two Point Suspended Scaffold ?
A:Price will offer you immediately after telling us your requirements of loading capacity, material and voltage.

Q2. Are you a factory or trading company?
A:We are direct factory with 40,4000 square meters factory and supply qualified products with factory price.

Q3. What quality certificate you own for your products?
A:Our products own EAC, CE and ISO9001 certificate.

Q4. How about the price?
A:Please send us inquiry, a consideration solution or preferable will be sent within 24 hours.

Q5. Delivery time?
A:According to order quantity, 10-20 working days will be finished after getting the deposit.




Leave your messages

Related Products

Popular products

x

Submitted successfully

We will contact you as soon as possible

Close