Application Scope and Dismantling Precautions of Construction Cradle

2024/01/17 15:17

Applications


Construction Suspended Platform have been widely used in China's related industries, and there has been great development and improvement. But in technology, manufacturing materials and processing technology there is further space. Such as lifting machine, lifting weight and self-weight ratio can be bigger. Especially 800kg lifting machine than 630kg lifting machine lifting capacity increased only 85kg, but nearly double the weight.


Construction Suspended Platform on the construction sites are welded with 2mm thin-walled tubes. This structure has been used for many years, proving that the quality is reliable. But there are some problems should also pay attention to: one of the tube wall is too thin, the combination of platform when the square tube connection parts of the bolts can not be tightened, some manufacturers, although equipped with a large diameter flat pads, taking into account the quality of the current operators, this approach needs to be improved.


Can the 630kg hoist increase the lifting capacity of 80kg through some small changes? In the electrical circuit can add some overload protection and prevent misoperation function? These have long been necessary facilities in the tower crane. The second is the connection of the bottom plate part, in order to wear bolts conveniently when installing, the use of long holes, M12 bolts with 14x20 long holes even with flat pads, for the mechanical equipment used for overhead work, it is also not desirable.


Precautions for dismantling construction cradles.


The dismantling of the construction basket at height should be carried out in accordance with the special construction programme and under the command of professional personnel.


Basket platform descending to the ground, the wire rope from the promotion machine, safety locks after withdrawal, blocking the total power supply. When dismantling the supporting hanging structure, corresponding safety measures should be taken for employees and equipment. The parts and components after dismantling and decomposition shall not be placed on the edge of the building, and measures shall be taken to prevent falling. Scattered items shall be placed in containers.


No part of the suspended platform shall be thrown from the roof. Dismantling Procedures Park the suspended platform on level and solid ground. Before dismantling, the suspended platform should be thoroughly inspected and the relevant conditions of the suspended platform should be noted down. Dismantle the wire rope and cable line Remove the weight and activate the downward button to pull the wire rope out of the hoist and safety lock. Block the power supply and pull up the wire rope at the position of hanging mechanism. The wire rope is removed from the hanging mechanism, rolled into a 60cm diameter disc and tied with a rope. The power cable is removed from the distribution box. Remove the power cable from the electrical box of the cradle. Put the power cable on the ground. Dismantle the hanging mechanism, remove the bolts, remove the reinforcing wire rope clamps and the front and rear supports. Remove the bolts, remove the front, middle and rear beams, and take down the counterweight.


Shandong Ruilt Mechanical and Electrical Technology Co., Ltd, founded in 2018, with a registered capital of 8 million yuan, is located in Ningjin County, Dezhou City, at the junction of Shandong Province and Hebei Province, with a superior geographic location, and has always been known for its "exquisite technology, reliable quality, and high quality service", to create customer-satisfying hanging basket products. Through the unremitting efforts of all R & D and manufacturing staff, Ruiert electromechanical has developed to three series of more than 10 brands, and according to user needs and construction needs in a timely manner to produce a variety of special specifications of the product, can meet the high-rise and multi-storey buildings of the exterior wall construction and decoration, shipbuilding operations, the installation of the lift into the road, large tanks, large-scale bridge construction, etc. Ruiert electromechanical rely on the quality of products and improve the service system, the quality and quality of products. Ruiert electromechanical rely on excellent product quality and perfect service system, precision craftsmanship to create user satisfaction with each product, and is willing to work with colleagues from all walks of life for common development and create brilliant!

"Construction Suspended Platform "


Related Products